Welcome to the Severinghaus Lab homepage!

Dr. Petrenko in the field

Loading a sample from the Blue Ice Drill, or BID, into “The Melter.” Ice is then heated with a 2.2 million-BTU propane burner and the trapped gasses are collected into a 30L stainless-steel tank.